Chi Thang's Scope of Works
Acting as member of the Main Contractor team, our team is in charge of the full Tower construction excluding permanent material supply. Our team is also full in charge of the installation, operation and dismantling of the 2 tower cranes (230 ton metre and 180 ton metre), 4 Alimak hoists, 6 nos 220 kVA generators, 2 nos 390 cfm air compressors, 3 to 5 stationary concrete pump and pipelines, water supply system, 2 nos. 11 ton HIAB trucks, 2 nos. 25 ton rough terrain crane until the completion of superstructure works. Our team was also in charge to install 4 nos. HEK platforms (for Freyssinet Vietnam) at the Tower, and 4 nos. cleaning platform for superstructure works and was also responsible for the lifting of superstructure formwork traveler and the stressing of brackets for the Pier table support and also the dismantling of the Tower Crane used for Pier construction.
Project Management for the full Tower construction including supply of pylon manager, construction manager, plant manager, site engineers, foreman, and tower crane operators, equipment operators and skilled labours. The team is used to manage the full construction of the Tower including concrete works, rebar works, formwork, post-tensioning, temporary and permanent steel fabrication, erection works, damper installation, steel stage installation, permanent elevator installation etc. Scope includes design, drafting and fabrication control of all temporary steel works, design and drafting of rebar, concrete geometry, post-tensioning, formwork, all permanent and temporary items, cast –item items; design and layout of all mechanical, pneumatic, water, electrical setup for the Tower construction, installation, operation and dismantling of all equipment. All planning, works program, methodology, construction sequence, lifting sequences, quality control, document control for the Tower construction,
Supply of permanent materials including DSI Post-tensioning Bars, Ancotech Rebar couplers
Supply of equipment including DOKA formwork systems, workshop, grout pump, 2 nos. 11 ton HIAB trucks, 2 nos. 25 ton rough terrain crane
Importer for elevator, plywood for superstructure, post-tensioning anchorage for superstructure, forklift, air compressor
Temporary structure design and fabrication control of elevator ties, tower crane ties, air, water, electric, working platforms, emergency access/man box, rebar jigging system, casting platform, waste/rubbish disposal, yard system, rebar lifting system, 2.5 m3 concrete skip, concrete distribution system, rebar cutting/bending/storage/movement system, post-tensioning, gang box, concrete spacer system, chamfer system, survey tower, C-Frame. |