Chi Thang's Scope of Works Acting as member of the Main Contractor team, our team is in charge of the full Pylon construction (North Pylon) excluding permanent material supply and major falsework. Our team is also full in charge of the maintenance of the 2 tower cranes (400 ton metre), 6 Alimak hoists, supply and maintenance of 3 nos 220 kVA generators, 1 nos 390 cfm air compressors, water supply system, 1 nos. 11 ton HIAB trucks, 1 nos. 25 ton rough terrain crane, 1 nos. 6 tons forklift 4 sets of DOKA automatic climbing formwork system. |