|
|
The climbing formwork MF 240 is the key to regular work cycles on all high structures. Of straightforward design, this system can be adapted to a very wide range of field requirements. |
- permits optimised adaptation to any construction project with no more than a few individual components
- easily extended to climbing formwork GCS or automatic climbing formwork SKE 50
- platforms 2.40 m wide, so plenty of space for working quickly and in safety
|
|
- enables speedy formwork positioning and retraction without crane
- reduces crane time, because the entire unit repositions quickly
- offers speedy, precision alignment of the formwork in all directions
- On structures with vertical walls, the climbing formwork MF 240 permits pouring sections up to 6 m high.
|
|
|
|
|
Quick Link
|
|
Case Studies
|
Constituting a networked unit of four separate parts, this high-rise complex was built in Frankfurt to a design by architects KSP Engel und Zimmermann. The two towers, one of 135 m and the other of 99 m, are visible from afar. Both of them were built using tried-and-tested Doka formwork solutions.
|
Project data Type of building: High-rise building Location: Nha Trang, Vietnam Start of construction: June, 2009 Building data Height: 140 m Method: Cores ahead Step height: Regular step height 3,45 m Floors: 40 Steps: 43 Additional info One step per week Contractor CotecCons, Vietnam Formwork design Chi Thang CET Co, Vietnam ...
|
|
|
|