binh cable stay bridge hai phong city vietnam

.

The Binh Bridge is a symmetrical dual plane stay cable bridge with a total length of 460 m, consisting of a main-span of 260 m and side-spans of 100 m each. The approach bridges have a length of 410 m (50m + 6 x 60m) on either side of the stay cable bridge. The composite steel-concrete deck has a width of 22.5 m. The Pylon structure is 101.6 tall, inclined at 8 degrees with 2 legs (diamond shape 3.5 x 3.5m from Lift 5) per pylon connected by a cast in-situ cross beam at an elevation of 80 m. Broad base legs (12.675 m x 6/3.5 m) for the first 4 lifts, each with a height of 6 m. Top of pylon anchorage is composite steel box and concrete. Spiral staircases are installed inside the pylon legs.
Our Services
- Equipment Renting
- Design of Temporary Structure
- Installation and Dismantle Services
Quick Link
News
to be cast the first part of base slab , with the diametre of 90m and height of 37m, shall be constructed using Doka climbing formwork system We, SPECO (HK) is the supplier of such good system to the main contractor - SHIMIZU Corporation and also we provide the technical service to the main contractor....

Next August, and after a year of intense work, three Comansa Jie cranes will finish the extension of the Fujian power plant, owned by public company "China National Offshore Oil Corporation" (CNOOC), the third biggest oil company in the country. Located in the city of Putian, on the southeast province of Fujian in China, the plant operates since 2007 transforming liquefied natural gas into electric power.